Free tool
Construction cost calculator
Enter your plot, floors and finish level and get an instant estimate with a material breakdown, labor, timeline and a price range, based on current Bangladesh market rates.
Area unit converter
- Sq.Ft
- 2,178
- Sq.M
- 202.34
- Katha
- 3.03
- Bigha
- 0.15
Steel structure estimate BDT 1,40,50,996 – BDT 1,58,44,741 (about BDT 964/sq.ft over 15,500 sq.ft), 2.3 months.
Estimated budget range
BDT 1,40,50,996 – 1,58,44,741
Most likely about BDT 1,49,47,869 (≈ 1.49 crore)
- Footprint
- 1,440 Sq.M
- Cost per sq.ft
- BDT 964
- Timeline
- ≈ 10.1 weeks (2.3 months)
- Primary members
- 30.2 MT
- Secondary members
- 7.5 MT
- Panel area
- 3,000 Sq.M
| Item | Quantity | Cost (BDT) |
|---|---|---|
| Primary members | 30.2 MT | 44,63,926 |
| Secondary members | 7.5 MT | 11,08,224 |
| Panels (Single Skin 0.5mm) | 3,000 Sq.M | 29,40,000 |
| Insulation (None) | — | 0 |
| Accessories | Ventilator, Roll-up Door | 1,17,000 |
| RCC foundation | footings | 37,44,000 |
| Fabrication & erection (Standard coating) | 37.6 MT | 14,30,687 |
| Transportation | 3.5000000000000004% | 2,97,925 |
| Contingency reserve | 6% | 8,46,106 |
| Total | 1,49,47,869 | |
Compared with pure RCC
A pure RCC building of this size would cost about BDT 3,64,25,038 and take about 3.3 months. This steel scheme is 59% lower in cost and 1 months faster.
Indicative estimate based on current Bangladesh market rates. It is not a quotation: final cost depends on site conditions, design and scope, confirmed after a site assessment.
Request a professional review of this estimate
Leave your details and an Apon engineer will check these figures against your plot and call you. No obligation.