Skip to content
APON BUILDERSUnited in Light — Guided by Truth

Free tool

Construction cost calculator

Enter your plot, floors and finish level and get an instant estimate with a material breakdown, labor, timeline and a price range, based on current Bangladesh market rates.

Accessories

Area unit converter

Sq.Ft
2,178
Sq.M
202.34
Katha
3.03
Bigha
0.15

Steel structure estimate BDT 1,40,50,996 – BDT 1,58,44,741 (about BDT 964/sq.ft over 15,500 sq.ft), 2.3 months.

Estimated budget range

BDT 1,40,50,996 – 1,58,44,741

Most likely about BDT 1,49,47,869 (≈ 1.49 crore)

Footprint
1,440 Sq.M
Cost per sq.ft
BDT 964
Timeline
≈ 10.1 weeks (2.3 months)
Primary members
30.2 MT
Secondary members
7.5 MT
Panel area
3,000 Sq.M
Cost breakdown
ItemQuantityCost (BDT)
Primary members30.2 MT44,63,926
Secondary members7.5 MT11,08,224
Panels (Single Skin 0.5mm)3,000 Sq.M29,40,000
Insulation (None)—0
AccessoriesVentilator, Roll-up Door1,17,000
RCC foundationfootings37,44,000
Fabrication & erection (Standard coating)37.6 MT14,30,687
Transportation3.5000000000000004%2,97,925
Contingency reserve6%8,46,106
Total1,49,47,869

Compared with pure RCC

A pure RCC building of this size would cost about BDT 3,64,25,038 and take about 3.3 months. This steel scheme is 59% lower in cost and 1 months faster.

Indicative estimate based on current Bangladesh market rates. It is not a quotation: final cost depends on site conditions, design and scope, confirmed after a site assessment.

Request a professional review of this estimate

Leave your details and an Apon engineer will check these figures against your plot and call you. No obligation.