Free tool
Construction cost calculator
Enter your plot, floors and finish level and get an instant estimate with a material breakdown, labor, timeline and a price range, based on current Bangladesh market rates.
Area unit converter
- Sq.Ft
- 2,178
- Sq.M
- 202.34
- Katha
- 3.03
- Bigha
- 0.15
RCC estimate BDT 99,38,438 – BDT 1,12,98,435 (about BDT 2,287/sq.ft over 4,574 sq.ft), 7.5 months.
Estimated budget range
BDT 99,38,438 – 1,12,98,435
Most likely about BDT 1,04,61,513 (≈ 1.05 crore)
- Built-up area
- 4,574 sq.ft
- Cost per sq.ft
- BDT 2,287
- Timeline
- ≈ 7.5 months
- Wastage allowance
- 7%
- Contingency reserve
- 10%
- Materials / labor
- 64.9 lakh / 23.8 lakh
| Item | Quantity | Cost (BDT) |
|---|---|---|
| Cement | 2,055 bags | 19,32,138 |
| Sand | 5,628 CFT | 7,59,788 |
| Stone chips | 6,362 CFT | 15,58,728 |
| Rebar Fe500D | 16.64 ton | 16,38,989 |
| Brick | 36,705 pcs | 3,96,411 |
| Waterproofing | allowance | 2,05,821 |
| Labor & finishes (Standard, Narayanganj) | 4,574 sq.ft | 23,78,376 |
| Site overheads & equipment | allowance | 2,74,428 |
| Adjustments (type, grade, schedule, height) | ×1.040 | 3,65,787 |
| Contingency reserve | 10% | 9,51,047 |
| Total | 1,04,61,513 | |
Indicative estimate based on current Bangladesh market rates. It is not a quotation: final cost depends on site conditions, design and scope, confirmed after a site assessment.
Request a professional review of this estimate
Leave your details and an Apon engineer will check these figures against your plot and call you. No obligation.